Aspire Faculty ID #18736 · Topic: UGC NET Computer Science Sep 2022 (Paper II) · Just now
UGC NET Computer Science Sep 2022 (Paper II)

If every requirement can be checked by a cost effective process, then SRS is called

Solution

SRS means Software Requirement Specification.

A requirement is called verifiable when it can be checked or tested by some practical process.

Here, the question says every requirement can be checked by a cost effective process.

This directly means that the requirement can be verified.

Now check the options:

Traceable means requirements can be traced from source to design or testing.

Modifiable means changes can be made easily in SRS.

Complete means all requirements are present.

Verifiable means each requirement can be checked or tested.

Previous 10 Questions — UGC NET Computer Science Sep 2022 (Paper II)

Nearest first

Next 10 Questions — UGC NET Computer Science Sep 2022 (Paper II)

Ascending by ID
Ask Your Question or Put Your Review.

loading...