UGC NET Computer Science Software Engineering Previous Year Questions (PYQs) – Page 2 of 11

UGC NET Computer Science Software Engineering Previous Year Questions (PYQs) – Page 2 of 11

A Place for Latest Exam wise Questions, Videos, Previous Year Papers,
Study Stuff for MCA Examinations
Reset
Showing 109 questions
logo
🎓 UGC NET Computer Science📅 Year: 2020📚 Computer🏷 Software Engineering

Match List I with List II.With reference to CMM developed by Software Engineering Institute (SEI)
List I List II
(A) INITIAL (I) Process measurement
(B) REPEATABLE (II) Process definition
(C) DEFINED (III) Project management
(D) MANAGED (IV) ADHOC
Choose the correct answer from the options given below:

1
2
3
4

logo
🎓 UGC NET Computer Science📅 Year: 2024📚 Computer🏷 Software Engineering

The cyclomatic complexity of the following flow graph is:


1
2
3
4

logo
🎓 UGC NET Computer Science📅 Year: 2024📚 Computer🏷 Software Engineering

Which of the following is not the goal of reverse engineering?


1
2
3
4

logo
🎓 UGC NET Computer Science📅 Year: 2023📚 Computer🏷 Software Engineering

Consider the following statements about the software product line system:

Statement I: At the interaction level, components provide an operator display interface and an interface with the communication system used.

Statement II: At the I/O management level, components handle operator authentication, report generator and query manager.

In the light of the above statements, choose the most appropriate answer from the options given below.

1
2
3
4

logo
🎓 UGC NET Computer Science📅 Year: 2020📚 Computer🏷 Software Engineering

Arrange the following types of Cohesion from best to worst type.

(A) Logical Cohesion

(B) Sequential Cohesion

(C) Communication Cohesion

(D) Temporal Cohesion

(E) Procedural Cohesion

Choose the correct answer from the options given below:

1
2
3
4

logo
🎓 UGC NET Computer Science📅 Year: 2023📚 Computer🏷 Software Engineering

Given below are two statements: one is labelled as Assertion A and the other is labelled as Reason R.

Assertion A: Validity checks real need of system users.

Reason R: Completeness checks system user defined requirements.

In the light of the above statements, choose the correct answer from the options given below.

1
2
3
4

logo
🎓 UGC NET Computer Science📅 Year: 2024📚 Computer🏷 Software Engineering

The ratio of error found before software delivery and to the total errors (before and after) is called:

1
2
3
4

logo
🎓 UGC NET Computer Science📅 Year: 2022📚 Computer🏷 Software Engineering

RAD software process model stands for-

1
2
3
4

logo
🎓 UGC NET Computer Science📅 Year: 2023📚 Computer🏷 Software Engineering

Given below are two statements:

Statement I: Subsystem models show logical grouping of objects into coherent subsystem

Statement II: State machine models show how objects change their states in response to events.

In the light of the above statements, choose the most appropriate answer from the options given below.

1
2
3
4

logo
🎓 UGC NET Computer Science📅 Year: 2022📚 Computer🏷 Software Engineering

If every requirement can be checked by a cost effective process, then SRS is called

1
2
3
4

UGC NET Computer Science


Online Test Series,
Information About Examination,
Syllabus, Notification
and More.

Click Here to
View More

UGC NET Computer Science


Online Test Series,
Information About Examination,
Syllabus, Notification
and More.

Click Here to
View More

Ask Your Question or Put Your Review.

loading...